Licensed Welding & Steel in Leakesville, MS
We found 12 active licensed welding & steel contractors serving Leakesville, Mississippi, verified against official state licensing records.
Welding & Steel Contractors in Leakesville, MS
Anthony G Smith
ActiveCL6-Welder
License #5871CL6
1966 HERNDON RD, 39451
Avery Tate
ActiveCL6-Welder
License #5863CL6
PO BOX 608, 39451
Cody Banks
ActiveCL6-Welder
License #5859CL6
PO BOX 608, 39451
Gabriel Saltares
ActiveCL6-Welder
License #5864CL6
PO BOX 608, 39451
Hugo Mejia
ActiveCL6-Welder
License #5874CL6
PO BOX 608, 39451
Jacob Guillory
ActiveCL6-Welder
License #5860CL6
116535 OLD HWY 24, 39451
Jason A Gibson
ActiveCL6-Welder
License #5875CL6
PO BOX 608, 39451
Jennifer T Wright
ActiveCL6-Welder
License #5872CL6
16535 OLD HIGHWAY 24, 39451
Juan Soliz, Jr
ActiveCL6-Welder
License #5873CL6
PO BOX 608, 39451
Montrel D Moulds
ActiveCL6-Welder
License #5861CL6
16535 OLD HWY 24, 39451
Robert K Breland
ActiveCL6-Welder
License #5613CL6
PO BOX 11, 39451
Shelby D Cooley
ActiveCL6-Welder
License #5876CL6
PO BOX 608, 39451
Frequently Asked Questions
What welding certifications should I look for?▼
For structural work, look for AWS (American Welding Society) D1.1 certification for structural steel or D1.3 for light-gauge steel. For pipe work, look for ASME Section IX certification. Certified welders have passed performance tests proving they can produce sound welds in specific positions and on specific materials.
What is the difference between MIG and TIG welding?▼
MIG (Metal Inert Gas) welding is faster and easier to learn, making it common for structural steel and fabrication. TIG (Tungsten Inert Gas) welding produces cleaner, more precise welds and is preferred for thin materials, stainless steel, aluminum, and ornamental work where weld appearance matters. Each process has specific advantages.
How long does custom metal fabrication take?▼
Simple projects like railings and gates typically take 2 to 4 weeks from measurement to installation. Complex structural work or ornamental pieces can take 4 to 12 weeks depending on design complexity, material availability, and finishing requirements. Custom architectural metalwork for commercial projects may take several months.
Do steel structures need to be painted or coated?▼
Yes, carbon steel must be protected from corrosion. Options include paint systems (primer plus topcoat), powder coating (factory-applied durable finish), hot-dip galvanizing (zinc coating for outdoor exposure), and weathering steel (Corten) that develops a protective rust patina. Interior structural steel may use intumescent coatings for fire protection.
Is structural steel better than wood framing?▼
Structural steel offers greater span capability, resistance to termites and rot, dimensional stability, fire resistance, and design flexibility. Wood framing is typically less expensive for residential construction and easier to modify. Many projects use both: steel for large spans and heavy loads, wood for partition walls and residential framing.
Other Trades in Leakesville, MS
Are You a Welding & Steel Contractor in Leakesville?
Create a free profile on List a Service and get discovered by property owners searching for welding & steel services in Leakesville, Mississippi.
Create Your Free Profile