Licensed Cabinet & Countertop in Salinas, CA
We found 9 active licensed cabinet & countertop contractors serving Salinas, California, verified against official state licensing records.
Cabinet & Countertop Contractors in Salinas, CA
Better Made Construction Cabinets LLC
ActiveCabinet, Millwork & Finish Carpentry
License #1147851
1328 BURTON AVE SUITE A11, 93901
Coastline Finish Carpentry INC
ActiveCabinet, Millwork & Finish Carpentry
License #874604
1722 GREAT ISLAND STREET, 93906
Ge Cabinets INC
ActiveCabinet, Millwork & Finish Carpentry
License #1110725
PO BOX 1001, 93902
Jorge Adalberto Garcia Gonzalez
ActiveCabinet, Millwork & Finish Carpentry
License #1058367
824 BEDFORD DR, 93901
Larry Showalter
ActiveCabinet, Millwork & Finish Carpentry
License #444671
27999 MESA DE TIERRA, 93908
Politron Woodwork
ActiveCabinet, Millwork & Finish Carpentry
License #1088966
1406 WOLF CT, 93905
Ralphy's Custom Cabinets
ActiveCabinet, Millwork & Finish Carpentry
License #1067394
255 E BOLIVAR ST SPC 32, 93906
Ravenswood Mill And Cabinet
ActiveCabinet, Millwork & Finish Carpentry
License #865637
621 W MARKET STREET, 93901
Shoreline Woodworks INC
ActiveCabinet, Millwork & Finish Carpentry
License #1130713
36 QUAIL RUN CIRCLE UNIT 109, 93907
Frequently Asked Questions
What is the difference between custom, semi-custom, and stock cabinets?▼
Stock cabinets come in standard sizes and limited styles at the lowest price point. Semi-custom cabinets offer more style and finish options with some size modifications at a mid-range price. Custom cabinets are built to your exact specifications with unlimited design options at the highest price. Quality exists at every level, and the right choice depends on your budget, timeline, and design requirements.
How long does a kitchen remodel take?▼
A complete kitchen remodel with custom cabinets typically takes 8 to 16 weeks from design approval to completion. This includes 4 to 8 weeks for cabinet fabrication, 1 to 2 weeks for countertop templating and fabrication after cabinets are installed, and 1 to 2 weeks for installation and finishing. Stock cabinet projects move faster, typically 4 to 6 weeks total.
Which countertop material is most durable?▼
Quartz (engineered stone) offers the best combination of durability, stain resistance, and low maintenance. It does not require sealing and resists chips and cracks. Granite is extremely hard and heat resistant but requires periodic sealing. Quartzite is the hardest natural stone option. Marble is beautiful but softer and more prone to etching from acids. Each material has trade-offs between aesthetics, maintenance, and durability.
Can existing cabinets be refaced instead of replaced?▼
Yes, cabinet refacing replaces doors, drawer fronts, and applies new veneer to cabinet boxes while retaining the existing cabinet structure. This costs approximately 30 to 50 percent less than full replacement and takes less time. Refacing works well when the existing cabinet boxes are structurally sound and the current layout is functional. It is not suitable if you want to change the kitchen layout.
How do I care for natural stone countertops?▼
Clean daily with mild soap and water or a stone-specific cleaner. Seal granite and marble every 6 to 12 months (water drop test: if water soaks in within 5 minutes, resealing is needed). Use trivets for hot pans and cutting boards to prevent scratches. Blot spills immediately, especially acidic substances like lemon juice, wine, and tomato sauce that can etch marble and limestone.
Other Trades in Salinas, CA
Are You a Cabinet & Countertop Contractor in Salinas?
Create a free profile on List a Service and get discovered by property owners searching for cabinet & countertop services in Salinas, California.
Create Your Free Profile