Licensed Cabinet & Countertop in Garden Grove, CA
We found 17 active licensed cabinet & countertop contractors serving Garden Grove, California, verified against official state licensing records.
Cabinet & Countertop Contractors in Garden Grove, CA
Adp Finish Woodwork INC
ActiveCabinet, Millwork & Finish Carpentry
License #1057640
11472 ROBERT LANE, 92840
Cabinets By John
ActiveCabinet, Millwork & Finish Carpentry
License #889392
13751 BOWEN STREET, 92843
Calvin James Installations
ActiveCabinet, Millwork & Finish Carpentry
License #850726
10912 DOROTHY AVENUE, 92843
David Fowler Cabinet Maker
ActiveCabinet, Millwork & Finish Carpentry
License #565262
13752 A BETTER WAY, 92643
Finishing Touch Woodworking INC
ActiveCabinet, Millwork & Finish Carpentry
License #870143
12271 INDUSTRY STREET, 92841
G D Woodworks
ActiveCabinet, Millwork & Finish Carpentry
License #1123165
13321 GARDEN GROVE BLVD STE G, 92843
Integrity Woodworking INC
ActiveCabinet, Millwork & Finish Carpentry
License #1000349
11472 OLSON DRIVE, 92841
J & J Custom Cabinets INC
ActiveCabinet, Millwork & Finish Carpentry
License #1042965
7602 ANTHONY AVE, 92841
K O C Custom Cabinet INC
ActiveCabinet, Millwork & Finish Carpentry
License #1078523
12938 LORNA ST, 92841
M D C Millworks INC
ActiveCabinet, Millwork & Finish Carpentry
License #917689
12771 MONARCH STREET, 92841
Noe Falcon Flores
ActiveCabinet, Millwork & Finish Carpentry
License #1106992
13064 BLACKBIRD ST APT 6, 92843
Outside The Box Cabinetry
ActiveCabinet, Millwork & Finish Carpentry
License #899293
10842 CHAPMAN AVENUE, 92840
Pacific Coast Stairs
ActiveCabinet, Millwork & Finish Carpentry
License #1008763
12861 WESTERN AVE, 92841
Pacific Coast Stairs LLC
ActiveCabinet, Millwork & Finish Carpentry
License #1156777
12861 WESTERN AVE STE C, 92841
Southwest Cabinets
ActiveCabinet, Millwork & Finish Carpentry
License #924468
7531 PARK AVE, 92841
Vic Woodpecker
ActiveCabinet, Millwork & Finish Carpentry
License #1101407
14300 CLINTON ST SPC 145, 92843
Vince's Custom Cabinets
ActiveCabinet, Millwork & Finish Carpentry
License #867077
12632 LEROY AVE, 92841
Frequently Asked Questions
What is the difference between custom, semi-custom, and stock cabinets?▼
Stock cabinets come in standard sizes and limited styles at the lowest price point. Semi-custom cabinets offer more style and finish options with some size modifications at a mid-range price. Custom cabinets are built to your exact specifications with unlimited design options at the highest price. Quality exists at every level, and the right choice depends on your budget, timeline, and design requirements.
How long does a kitchen remodel take?▼
A complete kitchen remodel with custom cabinets typically takes 8 to 16 weeks from design approval to completion. This includes 4 to 8 weeks for cabinet fabrication, 1 to 2 weeks for countertop templating and fabrication after cabinets are installed, and 1 to 2 weeks for installation and finishing. Stock cabinet projects move faster, typically 4 to 6 weeks total.
Which countertop material is most durable?▼
Quartz (engineered stone) offers the best combination of durability, stain resistance, and low maintenance. It does not require sealing and resists chips and cracks. Granite is extremely hard and heat resistant but requires periodic sealing. Quartzite is the hardest natural stone option. Marble is beautiful but softer and more prone to etching from acids. Each material has trade-offs between aesthetics, maintenance, and durability.
Can existing cabinets be refaced instead of replaced?▼
Yes, cabinet refacing replaces doors, drawer fronts, and applies new veneer to cabinet boxes while retaining the existing cabinet structure. This costs approximately 30 to 50 percent less than full replacement and takes less time. Refacing works well when the existing cabinet boxes are structurally sound and the current layout is functional. It is not suitable if you want to change the kitchen layout.
How do I care for natural stone countertops?▼
Clean daily with mild soap and water or a stone-specific cleaner. Seal granite and marble every 6 to 12 months (water drop test: if water soaks in within 5 minutes, resealing is needed). Use trivets for hot pans and cutting boards to prevent scratches. Blot spills immediately, especially acidic substances like lemon juice, wine, and tomato sauce that can etch marble and limestone.
Other Trades in Garden Grove, CA
Are You a Cabinet & Countertop Contractor in Garden Grove?
Create a free profile on List a Service and get discovered by property owners searching for cabinet & countertop services in Garden Grove, California.
Create Your Free Profile